How many A220 will be delivered this year? Well, if you read the Airbus Q3 Press Release, it will be 31. The press release said it will be 18 deliveries, counted from July 1st, when Airbus took over the program. There were 13 deliveries between January and June 30th, so in total that would be 31.
But I would say this is the upper limit. It could also be "just" 30.
Looking at specific customers it is unlikely they will get another four aircraft this year besides the first one delivered. Why: let's count:
The first aircraft for Delta, MSN 50020, was the 23rd aircraft for this year. Next in line to be handed over is 55044, a A220-300 (CS300) for Swiss. This could happen as early as tomorrow.
Then 55042 for Air Baltic should be the next one, having it's first flight on October 30th. Expect delivery in 2-3 weeks. Also 55045, again for Swiss, is waiting for the first flight - that should be every day now, as it is already a week late. We should expect a handover in late November.
The second Delta aircraft, 50021, is just before the pre-delivery stage. If it moves to the flightline quickly and gets through the test and customer acceptance flights as smooth as the first one, it could be handed over to Delta in late November as well.
That would be 27 until the end of November then. Then there is also 55037 for Korean Airlines and 55046, another one for Swiss. An the third one for Delta, 50022, could m ake it to the customer this year as well. These would be 30 then. I don't think that we will see 50018, on of the two remaining CS100 (A220-100) for Swiss getting ready this year. So Tanzania could be the customer of the 31st and final aircraft this year.
Remember that Bombardier said that they would ship 40 aircraft this year...
Showing posts with label Bombardier. Show all posts
Showing posts with label Bombardier. Show all posts
11/01/2018
A220 Deliveries in 2018
Labels:
A220,
A220-100,
A220-300,
Air Baltic,
Airbus,
Bombardier,
CSeries,
Delta. Swiss,
Tanzania
7/11/2018
First A220 order
It was just hours after Airbus officially renamed the CS300 to A220-300 when the first order under Airbus control came in yesterday. Jetblue ordered 60 A220-300 and took options for another 60 (per a MoU).
Also, Jetblue converted their order for A320neo to the larger A321neo, now having 85 A321neo on order but no A320neo anymore.
The 60 firm A220-300 will be delivered by H1 2025, the options would be delivered from 2025 onwards.
by that time the oldest A320ceo in Jetblue's fleet are 25 years old - time to say goodbye maybe? But then what? Jetblue could have ordered A320neo again, of course. But what if there would be a A220--500 (formerly known as CS500) by then? Maybe we have already seen a (tentative) launch order for the A220-500...
Also, Jetblue converted their order for A320neo to the larger A321neo, now having 85 A321neo on order but no A320neo anymore.
The 60 firm A220-300 will be delivered by H1 2025, the options would be delivered from 2025 onwards.
by that time the oldest A320ceo in Jetblue's fleet are 25 years old - time to say goodbye maybe? But then what? Jetblue could have ordered A320neo again, of course. But what if there would be a A220--500 (formerly known as CS500) by then? Maybe we have already seen a (tentative) launch order for the A220-500...
10/21/2017
The Bombardier-Airbus CSeries deal
I think it is not overstated when I say the last week changed the landscape of civil aircraft manufactures for years and probably decades to come.
The deal between Bombardier and Airbus that most likely from 2019 onwards lets the CSeries to be a majority owned Airbus product has the potential to influence how the product landscape will look like in 2030. And that includes the products that will be there and also that will NOT be there.
Let's image two things:
- Airbus and Bombardier decide to do the "simple stretch" CS500, meaning no changes to the wing, the engines, the landing gear and the Max Takeoff Weight. That would be a roughly 2400nm aircraft with about the capacity of the A320(neo), but with significantly lower empty weight and thus lower trip costs for the typical ranges of up to 800nm. The (official) launch could come by early 2019, after the expected closing of the deal. EIS could then be in 2022 or 2023.
- Airbus will adopt much of the cockpit and avionic technologies from the CSeries described here by Björn Fehrm for the A320neo (+, ++ or whatever it is called then) and also scale the wing for an A322. Development of the wing could also start in 2019 with an EIS maybe 2024, leapfrogging the potential Boeing NMA.
Although a A322 would not be the perfect "Middle of the Market" aircraft it could take away to many sales from the Boeing NMA to let the business case look unattractive. And the shrinking market share in the mich larger traditional narrowbody segment would drain on the cash flow.
So this past week has the chance of really becoming a defining moment...
7/14/2015
Will the "nuclear deal" lead to higher narrowbody production rates?
Now that obviously the sanctions on Iran will be lifted in the near future after the "nuclear deal" was reached, both Airbus and Boeing will have no problem in finding buyers for their last-of-the-line A320ceo and B737NG. Airbus is overbooked anyway but could afford to allow customers who want to do so to delay deliveries and to switch to the A320neo. Boeing will find Iranian airlines willing to take B737NG's, as there are still delivery slots open in 2017 and 2018 and maybe in 2019.
The real question though is if the pressure to go to even higher rates than already announced (52 for the B737NG/MAX in 2018 and 50 for the A320ceo/neo in 2017) will now lead to quick decisions at both Airbus and Boeing.
But also Bombardier and of course Embraer could benefit from the accord: Bombardier could especially find customers for the CSeries and Embraer could sell more of their E1 line to bridge production to the E2.
Boeing also might sell some B777's to bridge their production gap between the B777-300ER/B777F and the B777-X.
The real question though is if the pressure to go to even higher rates than already announced (52 for the B737NG/MAX in 2018 and 50 for the A320ceo/neo in 2017) will now lead to quick decisions at both Airbus and Boeing.
But also Bombardier and of course Embraer could benefit from the accord: Bombardier could especially find customers for the CSeries and Embraer could sell more of their E1 line to bridge production to the E2.
Boeing also might sell some B777's to bridge their production gap between the B777-300ER/B777F and the B777-X.
10/15/2014
New competition in Large Cabin Bizjet Segment
Yesterday Gulfstream announced their two new aircraft offerings in the Large Cabin segment, the G500 and the G600, powered with PW800 engines from P&WC. A very good summary of what these look like and what they can may be found in a long article from Aviation Week.
These aircraft borrow a lot of technology from the top-of-the-line G650(ER). In some cases, they top the G650, for example in the cockpit design.
Although Gulfstream says that these two new aircraft are additions to their product line and are not intended to replace the G450 and G550, I believe at least the days of the G450 are counted. If you read that the G500 will carry less fuel than the G450, but the G500 will fly 5000nm at M0.85, whereas the G450 flies 4220nm at M0.8. Moreover, the G500 has a cabin that is 2.5ft longer and 7 inches wider, providing a higher pressure in flight, making traveling more comfortable. Also, noise will be less, both out- and inside.
So I would not be surprised to see a run on these models comparable to the G650 when this aircraft was first announced. Production slots were sold every minute back then.
What will be the reaction from Bombardier. The G500 and G600 are clearly aiming at the Global5000 and Global 6000. We get a few hints when we search the Internet for the term "BR700NG": for example take a look here: GE is not the only one going for high tech ceramics in a business jet engine (the Passport 20 in this case). RR will also incorporate parts from this material in their BR700NG. And I am sure that
These aircraft borrow a lot of technology from the top-of-the-line G650(ER). In some cases, they top the G650, for example in the cockpit design.
Although Gulfstream says that these two new aircraft are additions to their product line and are not intended to replace the G450 and G550, I believe at least the days of the G450 are counted. If you read that the G500 will carry less fuel than the G450, but the G500 will fly 5000nm at M0.85, whereas the G450 flies 4220nm at M0.8. Moreover, the G500 has a cabin that is 2.5ft longer and 7 inches wider, providing a higher pressure in flight, making traveling more comfortable. Also, noise will be less, both out- and inside.
So I would not be surprised to see a run on these models comparable to the G650 when this aircraft was first announced. Production slots were sold every minute back then.
What will be the reaction from Bombardier. The G500 and G600 are clearly aiming at the Global5000 and Global 6000. We get a few hints when we search the Internet for the term "BR700NG": for example take a look here: GE is not the only one going for high tech ceramics in a business jet engine (the Passport 20 in this case). RR will also incorporate parts from this material in their BR700NG. And I am sure that
- the BR700NG will be the engine for an update of the Global 5000/6000
- that this update will be announced at the NBAA in Orlando next week
Labels:
Bombardier,
G500,
G600,
Global5000,
Global6000,
Gulfstream
7/10/2014
Farnborough Preview
There are already some previews out there, for example from Leeham
and airchive,
so I won’t repeat all that is said there…but:
A330neo
Of course
the BIG question is if Airbus will launch the A330neo at the show – and not, if
they will launch it or not. Even if Airbus officials always state that a final decision has not been made – that may
be true from a formal perspective, but the decision has already been made by
the potential customers who would otherwise turn to Boeing, at least some of
them. This would not be an option for Airbus, of course.
My guess is
that Airbus will at least make an “ATO launch”, but recent stories from reuters
and Bloomberg
suggest that Airbus is looking for last-minute commitments from the likes of
AirAsia and ALC to make a launch like we have seen it from Boeing for the B777X
at the Dubai Air Show last year.
Narrowbodies
Indigo will
likely go ahead with an order
for another 200 A320neo’s, Bloomberg reports today. This has to be seen in the
context of the forthcoming IPO and a possible future shareholder stake from Qatar
Airways. Indigo would then not only grow further in the indian domestic market,
but also become the feeder from the whole indian subcontinent for the Qatar Airways
longhaul fleet out of Doha.
Monarch
reportedly switches to Boeing – a blow to Airbus of course, but this deal is probably
driven by commercial terms which do not leave a big margin for both aircraft
and engine manufacturers.
There could
be a number of additional orders in the narrowbody market as usual, especially
on the Airbus side. Boeing could announce a number of undisclosed customers for
the B737MAX.
Not sure if
Bombardier can announce something. Monarch adding the CSeries to the larger
B737MAX (I expect only the -8 and -9 here) would make sense, but Scott
Hamilton is not very optimistic on that one.
Widebodies
I refer to Leeham
and airchive
here…
Regionals
I expect
Embraer to announce one or more orders for the E2 family, maybe a second lessor.
Maybe also some E1 sales…
ATR will
for sure have some sales for the ATR72-600. Bombardier always finds it hard to
be able to announce during a show due to strict disclosure rules in Canada.
I do not
expect anything from Mitsubishi for the MRJ…
Narrowbody
engines
This is
where we can expect large deals to be announced. American
Airlines choosing the LEAP-1A already leaked. A logical choice as GE, CFM
and GECAS have great leverage to sweeten the deal with non-neo issues.
Also we can
expect that easyjet announced their choice of engines for the A320neo fleet.
Any other choice than CFM would be a surprise, for the same reasons as for the
AA decision. The same could be said for Lion Air, although there were rumours
earlier they would opt for the PW1100G-JM. There are a number of other open
A320neo decisions where the direction is not so clear (VivaAerobus, Philippine
Airlines, Interjet, Transaero, China Eastern, China Southern, …)
Widebody
Engines
The RR
Trent1000 to be the choice for the A330neo
now seems to be a given. GE could make some deals with the GE9X of
course, RR with the A350 if orders materialize for the respective aircraft. Other than that nothing to exciting here.
The devil is in the detail - it does not look too boring neither too exciting as yet. But there could be "unknown unknowns"...
2/20/2014
„Premature“ engine upgrades
In the context of my last post I wondered why MTU now starts
talking about an upgraded GTF to be delivered in 2019. We are one and a half
years away from EIS of the PW1100G on the A320neo and the engine is - well – not selling bad. Why announcing an
upgrade now? To enhance SFC by 3% does not sound cheap - GE and RR needed two improvement packages to bring the engines for the B787 to SFC spevc level.
Furthermore MTU COO Rainer Martens told the press that these enhancements could also be implemented into the other PW1000G family members (PW1200G/PW1700G for MRJ/E175E2 and PW1500G/PW1900G for CSeries/E190E2&E195E2). So we can be sure that all aircraft OEM’s will sooner or later ask for the upgrades, just a couple of years after EIS of their respective aircraft – remember that the E175E2 should have an EIS in 2020, AFTER the PW1100G is available with the upgrade. Sounds like all the development engineers will have secure jobs at P&W, MTU, JAEC and the other PW1000G partners for the years to come. Good for them, bad for the "bean counters" in the companies and the financial breakeven of the engine programs.
For Airbus, the revelation has probably a good and a bad side. The good side is that the A320neo will enhance the competitive position against the B737MAX (and maybe later a CS500), but also the A319neo could be in a better position against the CS300. On the other side, remaining delivery positions for the A320neo in 2018 will be not that easy to fill without giving another discount for not getting the upgrade.
Furthermore MTU COO Rainer Martens told the press that these enhancements could also be implemented into the other PW1000G family members (PW1200G/PW1700G for MRJ/E175E2 and PW1500G/PW1900G for CSeries/E190E2&E195E2). So we can be sure that all aircraft OEM’s will sooner or later ask for the upgrades, just a couple of years after EIS of their respective aircraft – remember that the E175E2 should have an EIS in 2020, AFTER the PW1100G is available with the upgrade. Sounds like all the development engineers will have secure jobs at P&W, MTU, JAEC and the other PW1000G partners for the years to come. Good for them, bad for the "bean counters" in the companies and the financial breakeven of the engine programs.
For Airbus, the revelation has probably a good and a bad side. The good side is that the A320neo will enhance the competitive position against the B737MAX (and maybe later a CS500), but also the A319neo could be in a better position against the CS300. On the other side, remaining delivery positions for the A320neo in 2018 will be not that easy to fill without giving another discount for not getting the upgrade.
2/19/2014
The B757 successor discussion
Yesterday MTU’s COO Rainer Martens revealed during the
annual results presentation that there is a plan
to upgrade the PW1100G engine for the A320neo with another 3% SFC jump by 2019.
On a side note, as the turbo machinery of the PW1100G and the PW1400G are
identical, the MS-21 will also benefit
from that as I think that P&W and their partners will not start building two different engines.
But what does that mean in a broader context?
Firstly, we can be very sure that a similar PIP (Performance
Improvement Package) will also be worked out for the LEAP-1A (and the LEAP-1C
destined for the COMAC C919, as this engine has the same turbo machinery as
well). Another
report on a german website cites MTU’s Martens that the 3% improvement are
agreed with Airbus so we expect that there is a corresponding agreement between Airbus and CFM to lower SFC
around 2019/20. As the GE9X goes into service by that time frame we can expect
a lot of technology transfer from the GE9X to the LEAP-1A – and subsequently to
the LEAP-1B for the B737MAX.
Secondly, this makes the business case for any A320neo and
B737MAX successor harder. This is why I do not believe in a B757
successor in the time frame that was discussed by Scott Hamilton and others
lately. At least not in the sense of a purpose build aircraft. Here is why:
·
The 3% lower SFC for the A321neo (and probably
sooner or later also for the B737MAX-9) leads to 100+nm more range, bringing
these two aircraft even closer to the capabilities of the B757 today.
·
As of today the A321ceo can do about 95% of all
routes flown by the B757 today. And the A321neo can only NOT do five city pairs flown by the B757 today (I go that verbally
from Airbus).
Add the 100 extra miles coming out of the engine improvement
and what is left? Maybe three routes, maybe four routes, maybe still all five.
Add some improvements to the airframe and what is left then…?
I am sure there is no business case left then for building a standalone
aircraft with the capabilities of the B757. But also as part of a new family of
narrowbodies, aka the A30X and the B797, there is no real need to compromise
the efficiency of the whole family with a wing that is large enough to cover
distances more than what the A320neo/B737MAX families will do. Otherwise Airbus
and Boeing could lose market share against a Bombardier CS500 and a forthcoming
Embraer small narrowbody which are
designed for ranges less than 3000nm.
But I do not see these new breeds coming a of 2025 as James
N. Krebs postulated in this very interesting guest
column at Leeham News. But if we see a further 3% improvement from the
engines at the end of the decade, how should there be another jump of 20% in
fuel burn in 2025? The technology for an aircraft with an EIS must be defined
by 2018/19. With a regular tube-and-wing aircraft I cannot see a jump more than
10% from the airframe - if designed for the same range (more range: less
efficiency gain for shorter routes). If we take 1% efficiency gain for every
year from improved engine design (and that seems optimistic as it gets harder
and harder), we get a maximum of 15% versus neo/MAX. Not taken into account
that there can still be something done to the existing aircraft as well like building
the fuselage from AlLi or enhancing the wing. The business case for an all new
aircraft then disappears in my eyes. But I am not a bean counter…err…
accountant.
Another question is if someone will do something in the
sector left by the likes of the A300-600R and the B767-300(non ER): 250-300
seats, 4000nm max range. Being hinted to think about that, as can be read in
the Pudget Sound article. I do not count that as a B757 successor and I do not know if there is a business case for
that but Lufthansa always cried for “people mover” like that.
1/29/2014
Embraer bridging between E1 and E2
Much hype there was during and after the Paris Air Show last
year, when Embraer launched their EJet E2 family. 365 orders, MoU and LoI from
Skywest, ILFC and five unannounced customers sounded like a good start and some
media was quick to compare it to the current backlog of the CSeries, which had a
similar amount of orders at this time – but 5 years the “launch” LoI from
Lufthansa/Swiss.
Now, a few months later, there are “just” two the two orders that were announced at PAS13: 100
aircraft for Skywest (E175E2) with 100 further options and both 25 E190E2 and
E195E2 for ILFC also with an equal number of options. None of the five unannounced
customers came forward since June 2013 and no other customer was added.
Last week Embraer announced their numbers for orders and
deliveries in 2013. Deliveries for the EJets were exactly at plan with 88 for
the year. Orders looked great with American, United, Skywest ordering large
numbers of E175 and taking even more options.
But let’s have a deeper look in the orderbook: Open Orders
at the beginning of the year was at 279:
1 E170
188 E175
73 E190
17 E195
The E170 is obviously one delivery away from dead. It is too small for the North American
regional market, where the new sweet spot if 76 seats in two classes and this
is where the E175 fits in ideally. The backlog of 73 for the E190 does not look
too bad at first glance, but in fact you have to subtract the 24 E190 for
Jetblue as they are deferred until after 2020, when the E2 version of the E190
is available and Jetblue made it already clear that they are aiming for a
switch to the E2. It could also be that they will abandon the 100 seater
altogether by that time and finally cancel the order.
The 7 E190 in the orderbook from flynas (or Nasair) are also questionable, as the airlines is phasing out their EJets they already have. Another shaky part of the order book are the 24 open orders
for E175 from flybe. The carrier is deep in a restructuring phase and has to
become profitable soon. But let’s keep them in for that following exercise:
Without the 24 E190 for Jetblue the backlog at Jan. 1st,
2014 was 255 aircraft. With a constant delivery rate of 88 aircraft per year the
backlog will be at zero in Q4 2017 2016. But the EIS for the E190E2 is slated for
the middle of 2018, the E195E2 should come in 2019 and the E175E2 finally in
2020. So Embraer has
-
to find more customers for the current EJets
or
-
to speed up the development of the E2 family
Well,
in essence, they have to do both, I would say!
Embraer
first announced the EJet E2 with in January 2013 when they said that they will
be powered by PW1700G and PW1900G engines by P&W. These engines are
essentially the engines for the Mitsubishi MRJ (PW1200G) and the Bombardier CSeries
(PW1500G). These engines are already existing, tested and, in the case of the
PW15000G, certificated. This is the big difference between the EJet E2 reengine
program and the A320neo and B737MAX program, where the engines are the pacing
item.
The
EJet E2 aircraft are getting new wings, new undercarriages, a new flight deck and
a full fly-by-wire system: sure, these things take their time, but Embraer took
a lot of time already to decide how to react to the MRJ, CSeries and the
A320neo/B737MAX. So there should have been more than just a concept at the
beginning of last year and Embraer is currently testing a full fly-by-wire
system with their Legacy 500 Business Jet. In fact, they “learned” so much that
they switched to Moog as a supplier for the FBW system for the E2 Jets, as the Parker
system contributed a lot to the delay of the Legacy 500/450 program (there
could also be another reason behind that switch, as Parker is part of the “GE World”
and GE lost the engine contract…).
In
short, I think Embraer has to bring forward the E2 program as much as they can –
otherwise they would face a production hole – but wait: there is hope: if the
Mitsubishi MRJ would be delayed even further, the two big customers (Trans
States and Skywest) for the MRJ would be forced to look at alternatives. The
only logical aircraft that could replace the MRJ90 deliveries in the 2016/2017
time frame with the same cabin comfort would be the E175E1. This might be the
reason why Skywest took options for 100 E175E1 last year when placing the order
for 40 E175E1. Also United, American Airlines and Republic took further options
for the E175E1. It looks like there is a considerable “hedging” against a
further MRJ delay and this might help Embraer to bridge to gap between the
current E1 and the forthcoming E2.
Labels:
Airbus,
Boeing,
Bombardier,
CSeries,
Embraer,
Mitsubishi,
MRJ,
PW,
PW1200G,
PW1500G,
PW1700G,
PW1900G
9/17/2013
Lufthansa "launches" another aircraft
Remember? It was Lufthansa who launched the Bombardier CSeries with it's "Letter of Interest" on the eve of the Farnborough Air Show 2008. Now, just days after the CSeries conducted the first flight, it looks like Lufthansa will launch the B777-9 with it's long awaited widebody order due this week (Supervisory Board meets on Wednesday).
Lufthansa has a long history of being the launch customer for new aircraft. Most notably probably for the B737 (-100 and -300), but also for the B747-400, B747-8I, the A310, A340 and the A321.
Not all of these aircraft were (or are) as successful as the B737 and the A321, but from the sales of the current B777-300ER one can expect that the B777-9 (and -8) will eventually be best-sellers.
This week will not just be a first flight week, but also a first order week...
Lufthansa has a long history of being the launch customer for new aircraft. Most notably probably for the B737 (-100 and -300), but also for the B747-400, B747-8I, the A310, A340 and the A321.
Not all of these aircraft were (or are) as successful as the B737 and the A321, but from the sales of the current B777-300ER one can expect that the B777-9 (and -8) will eventually be best-sellers.
This week will not just be a first flight week, but also a first order week...
First Flight Days
Yesterday finally the first flight of the Bombardier CSeries CS100 happened, about nine months late. JUST nine months late, one has to say these days. Comparing to the delays of the latest aircraft from Airbus and Boeing nine months is not so bad...
Now we have to watch how quickly Bombardier can bring the following test aircraft up in the air. FTV2 should follow within a month, Bombardier previously said. If that really holds true, we might see a first delivery in 2014, otherwise I expect a slip into 2015.
Today another, considerably larger aircraft, will have it's first flight: the B787-9. Originally scheduled to enter airline service in 2010, the first delivery to Air New Zealand should now happen mid-2014. Of course, much of the delay is due to the delay of the original B787-8, but approximately another half year of delay came after the B787-8 flight test program was finished.
I expect the B787-9 to get more sales than the B787-8. And probably also the B787-10 will surpass the -8.
Now we have to watch how quickly Bombardier can bring the following test aircraft up in the air. FTV2 should follow within a month, Bombardier previously said. If that really holds true, we might see a first delivery in 2014, otherwise I expect a slip into 2015.
Today another, considerably larger aircraft, will have it's first flight: the B787-9. Originally scheduled to enter airline service in 2010, the first delivery to Air New Zealand should now happen mid-2014. Of course, much of the delay is due to the delay of the original B787-8, but approximately another half year of delay came after the B787-8 flight test program was finished.
I expect the B787-9 to get more sales than the B787-8. And probably also the B787-10 will surpass the -8.
9/09/2013
CSeries doing further taxi tests...
The CSeries FTV1 is just doing further taxi tests and reached 120mph during the third run of the day. Watch it live here:
http://planefinder.net/flight/BBD501
http://planefinder.net/flight/BBD501
9/06/2013
CSeries makes progress to first flight
Finally, the CSeries FTV1 just makes high speed taxi tests. For best up-to-the-minute coverage, please follow Sylvain Faust on Twitter (@sylvainfaust).
If these tests today are not showing any snags, the first flight will follow soon. Weather for Sunday is not too promising, but better for Monday, so whatch out for a first flight early next week...
If these tests today are not showing any snags, the first flight will follow soon. Weather for Sunday is not too promising, but better for Monday, so whatch out for a first flight early next week...
9/04/2013
Race to First Flight
In early June the aviation world still wondered which aircraft would fly first: the Bombardier CSeries CS100 or the A350-900. Then, in the week before the Paris Air Show Airbus managed to get the A350 up in the air. During the Air Show Bombardier officials still stated that the CS100 would fly until the end of June, aka in the last week of June. Then First Flight was delayed until "by the end of July", due to an upgrade of the software.
The end of July came and Bombardier once again delayed the first flight, now only saying that it would happen "in the coming weeks".
During that time Low Speed Taxi tests happened and Transport Canada recently awarded the Flight Test Permit.
During the Moscow Air Show two airlines announced that they would take five CS300 each from Ilyushin Finance Lease (VIM and UTAir Ukraine).
But we are still waiting for first flight and we haven't heard of any high speed taxi test and the RTO (rejected take off). And now we hear that Boeing is not too far away from getting the B787-9 in the air. So which aircraft will be first to get the landing gear up from the ground? Once again the (virtual) race is on. Of course none of the two manufacturer will rush just to be first - safety is always first! But it's time for Bombardier to prove that the CSeries is not a paper aircraft!
During that time Low Speed Taxi tests happened and Transport Canada recently awarded the Flight Test Permit.
During the Moscow Air Show two airlines announced that they would take five CS300 each from Ilyushin Finance Lease (VIM and UTAir Ukraine).
But we are still waiting for first flight and we haven't heard of any high speed taxi test and the RTO (rejected take off). And now we hear that Boeing is not too far away from getting the B787-9 in the air. So which aircraft will be first to get the landing gear up from the ground? Once again the (virtual) race is on. Of course none of the two manufacturer will rush just to be first - safety is always first! But it's time for Bombardier to prove that the CSeries is not a paper aircraft!
7/25/2013
The long wait...
Two days, two announcements, two delays: yesterday Bombardier
told the aviation public that the CSeries will not fly in July for the
first time, but in „the coming weeks“.
Today Mitsubishi
Aircraft announced that the MRJ will not fly this year, but until the end
of 2014 - a full one year delay (again).
This is of course disappointing. According to the article Mitsubishi still has
problems how to document the design and the production of the parts to be compliant
with certification rules (this is my interpretation, based on what was the
reason for the last delay). At least, it seems, there seems nothing wrong with
the design of the aircraft itself.
The same can be said for the CSeries – hopefully! It seems
that the integration of the software takes more time than planned. The question
is why until now the Bombardier executives always build up pressure by
announcing exactly when first flight will happen. Airbus with the A350 was
smarter by only saying first flight would happen in the second half of 2013 and
the surprising the aviation world by beating that target by two weeks. At least
Bombardier has learned now by being vague. On the other side that does not
build up confidence, especially because fixed dates were given three times
before (end of 2012, end of June 2013, in July 2013). So everyone who waits for
this first all-new narrowbody since the A320 first flew in 26 years ago in 1987
should hope that “in the coming weeks” does mean in the “next low single digit number
of weeks”.
7/05/2013
Paris Air Show 2013 Recap
The Paris Air Show 2013 is history – and it wrote (at least
a little bit) of aviation history:
Embraer
On the opening day it was Embraer to launch it’s highly
anticipated EJet E2 family. Not surprisingly, the E195-E2 will be a stretch of
the current E195. Also no surprise that the E170 will not be continued and that
the E190-E2 will stay where it is, sizewise. The E175-E2 will be a little bit
larger in capacity, stretching it’s fuselage by 0.62m or 24.4inches. The effect
is that two more seats can be fitted and in a 1-class 31” layout there are now
88 seats compared to 86 seats in the current E175. This is exactly the figure
that Mitsubishi gives for the MRJ90 – any questions? With the same engine as
the MRJ will get, the same cabin capacity and a new wing (even larger now than
the MRJ wing) the fuel efficiency of the two aircraft should be very close to
each other. The MTOW of the E175-E2 is a little bit higher (44.33 t vs. 42.8t),
but the Embraer has more range, too (1920nm vs. 1780nm).
6/12/2013
Embraer EJets G2 launch at Paris Air Show
Embraer will host a press conference regarding commercial
aviation during the Paris Air Show next week on Monday (see the press release here). My strong guess is
that this is where we will see the official launch of the EJet G2 Series.
And I guess Embraer will not only announce the official go-ahead
but also will announce one or more first customers for the three-member strong
family.
Labels:
Bombardier,
CSeries,
EJet,
EJet G2,
Embraer,
Jetblue,
Lufthansa,
Paris Air Show
3/26/2013
More narrowbody orders
As
forecasted, we have already seen quite impressive narrowbody orders this
year, although the Paris Air Show is still ahead of us.
For example, there are already orders for 461 more A320neo
family aircraft – remarkably most of the for the A321neo – this year. In 2012
we saw 478 firm orders, some of which had already been announced at the Paris
Air Show in 2011.
The B737MAX had it’s big year in 2012, so we cannot expect
that we see more than the 949 orders from 2012 in 2013 again. So far the
B737MAX got 121 orders this year.
But I expect more big orders for both narrowbodies in 2013.
I already wrote about China and the needs of the airlines there, but now it
becomes clearer. According to CAPA (Centre for Aviation) , the China
Times writes that chinese airlines will order about 500 narrowbodies from both
Airbus and Boeing in 2013. About half of these orders would be for the neo and
MAX models. This would not only be a(nother) boost for both reengining
programs, it would also fill further the remaining delivery slots for the
current models.
Adam
Pilarski from AVITAS still thinks that we see a bubble with all these
narrowbody orders. He could be right – if we would see an economic crisis
hitting South East Asia and China, a lot of these orders would quickly
disappear. But as long as these economies are thriving, Airbus and Boeing (and
in the long run probably also Bombardier and Embraer) have nothing to fear but
not being able to quickly enough deliver the ordered aircraft.
2/21/2013
Good day for Bombardier CSeries!
It was a good day for the Bombardier CSeries yesterday (Feb.
20th).
The PW1500G, P&W’s first Geared Turbo Fan, was certified
by Transport Canada. As the development of a complete new engine is always a
risk, now one major risk on the whole CSeries program isn’t one anymore. It is
also good news for Embraer, planning to use the same engine with slight changes
to the externals dubbed as PW1900G, for
the upcoming and still-to-launch E190G2 and E195G2. Embraer can now bank on an engine
that is proven in service for a few years when the G2 EJets enter service. That
might have been one reason to choose the GTF over the NG34 and LEAP engines
from GE and CFM.
But back to the Bombardier CSeries. The aircraft program got
also a major commercial boost yesterday, when Ilyushin Finance signed a firm
order for 32 CS300 plus 10 options. The original LoI called for 3 CS100 and 7
CS300 with ten options and ten purchase rights, so Ilyushin Finance upped their
original commitment substantially.
Now the whole aerospace world is waiting for the first
flight of the CSeries (and as well for the first flight of the A350 and London
bookmakers are taking bets who is first).
Later today there will be the conference call for results of the fourth
quarter and fiscal year ended Dec. 31st. Maybe we will hear more on
the progress of the program.
Labels:
Bombardier,
CSeries,
EJet G2,
Embraer,
Ilyushin Finance,
PW1500G,
PW1900G
1/28/2013
Narrowbody Outlook 2013
After Boeing and Airbus unveiled their final order and
delivery numbers for 2012 it is now time to turn to what is ahead. What will
2013 bring us in the narrowbody segment?
Let’s begin with deliveries – this is quite easy:
·
Airbus stabilizes their output rate at 42/month
and will deliver 480-485 A320 family aircraft (ca. 11.5*42 as we have to take
the summer break into account)
·
Boeing will increase the delivery rate
towards 38 B737NG’s per month and
therefore deliver between 450-460 narrowbodies.
·
Bombardier will deliver the first CS100 in 2014,
so A & B are (probably for the last time) alone.
Labels:
A320,
A320NEO,
Air France,
Airbus,
American Airlines,
B737MAX,
B737NG,
Boeing,
Bombardier,
CSeries,
easyjet,
flydubai,
Jet Airways,
Lion Air,
Lufthansa,
SpiceJet,
TUI,
Turkish Airlines,
Vueling
Subscribe to:
Posts (Atom)