Embraer decided to abandon plans for a new 5 abreast aircraft for now and instead opted to reengine to EJet's in the latter half of the decade - EIS could be in 2018. Given that Embraer could not do both at the same time - financially, but also due to manpower restrictions, as the KC-390 is in development also, this seems to be a wise decision.
Let us look at the timeline: in 2018 all new engines currently under development for the MRJ, CSeries, the A320neo, the B737MAX, the C919 and the MS-21 will be in service. Of course one could ask at least in case of the latter two if the EIS dates for these will stay where they are now. But Embraer will have a good idea how the engines - two versions of the LEAP (the C919 LEAP-1C will have the same turbo machinery as the A320neo LEAP-1A) and three types of the GTF (MRJ, CSeries and A320neo/MS-21) - are doing during development. An EIS in 2018 would probably mean an engine selection about 5 years earlier, around 2013, maybe 2014. By that time the PW1200G and PW1500G are flying at least on the respective aircraft prototypes and the first PW1100G engine should run on ground (the LEAP-1A seems to be a bit behind).