Conner also said that there was (and is, I suppose) pricing pressure
on the B737MAX, but this is normal for new aircraft entering the market.
Where the pricing pressure comes from gets clear when we
look at the number of open orders and the orders Boeing has to fill until the
B737MAX enters service in late 2017 and until the B737MAX
will take over full production. This will take about two and a half years if we take the transition phase of the A320neo as an example.
will take over full production. This will take about two and a half years if we take the transition phase of the A320neo as an example.
We are now 56 months away from EIS of the B737MAX. Right now (March
2013)builds the B737NG at a rate of 38 a month. In the first
half of 2014 the build rate will reach
42 a month.
At January 31,2013, Boeing had 1958 unfilled orders for the
B737NG.
In the 11 remaining months of 2013, Boeing will build 418
B737NG.
Given that rate 42 is reached in June 2014, Boeing will build
480 B737NG in 2014.
In 2015 and 2016 Boeing will then build 504 B737NG each.
Until December 2017, when the first B737MAX should enter
airline service with Southwest Airlines, 462 aircraft will be build.
Altogether: 2388
B737NG until December 2017. So Boeing has to sell another 430 B737NG to fill
all slots until the first B737MAX arrives. Another 700 slots are to be filled
until June 2020, when the B737MAX should take over full production.
Now compare this to the A320ceo/A320neo situation:
At January 31,2013, Airbus had 1846 unfilled orders for the
A320ceo.
Airbus will build another 445 A320ceo in the remaining 11
months of 2013.
In 2014 Airbus will build about 485 A320ceo.
Until October 2015, when the first A320neo should be
delivered to Qatar Airways, Airbus will have build another 365 A320ceo.
Altogether: 1295 A320ceo until October 2015. Another 700
A320ceo delivery positions remain until the A320neo takes over full production
in the middle of 2018. This leaves Airbus with around 150 delivery positions to
fill. EADS said in December of last year that there are about 300 positions left. I suspect that there are some cancellations build
into these 300 positions. The most obvious candidate is Kingfisher. There are
67 open deliveries from Kingfisher and Kingfisher Red. Another suspect is
Delta: they inherited 7 open deliveries from Northwest Airlines, which they can
cancel without penalty. United Airlines also has 42 unfilled orders for the
A320ceo family. If I add these, I am at 262 open slots, not too far from what
EADS said.
Now to the pricing pressure on the B737NG: as long as there
are open slots either for the A320ceo or A320neo, the pricing pressure from
Airbus will persist. But the pressure could also come from another side: the
lessors. Even if there are no open slots at Airbus, airlines might find lessors
which have A320neo slots available. Especially ILFC as the first leasing
company to buy the A320neo should have plenty of aircraft available. The
only airlines so far openly committed to take A320neo from a lessor is Spirit
Airlines.
But lessors could also compete with the B737MAX against the
B737NG. Right now leasing companies have ordered 250 B737MAX. ALC for example
gets their 80 B737MAX between 2018 and 2022. If an airline manager has a choice
between buying an aircraft which is from the “last-of-the-line “ batch with
probably not so good residual value and to lease the new model which burns something like
13% less fuel, I would negotiate very hard with both!
Good deals could be ahead in the coming years for airlines…
Very good breakdown "AeroT." Although I can's see that many planes being taken by airlines (about 4 thousands between the two OEMs) in such a short period of time (four years) the way the economies of most countries still are humping along, the 737NG seems to be the one with the bigger challenge. Not only because it has to compete with its own cousin (the MAX) but because of the amount of time that it will be still offered when other more efficient models will be coming out of the "press" (A320NEO and C300 series). But There are always airlines willing to take the plunge (Ryan Air) if the price is right.
ReplyDeleteAltogether: 2388 B737NG until December 2017. So Boeing has to sell another 430 B737NG to fill all slots until the first B737MAX arrives. Another 700 slots are to be filled until June 2020, when the B737MAX should take over full production.
ReplyDeletethis is a HUGE ASSUMPTION...as it assumes constant production rates......which is just NOT a good assumption......so at this point its a nice "story"